In recent years, Dubai and surrounding Gulf countries have seen intensive construction activity in the followin areas:
Traditional reliance on imports has resulted in high costs and long lead times; therefore, customers are choosing to build their own production facilities.

Based on the client's needs, JCT ultimately customized a two-component silicone sealant production line solution for them, with core equipment including:

JCT proceed using standard engineering project procedures:
1. Process package + workshop layout design
Based on the client's factory dimensions, JCT provides: 3D layout of the production line, material flow direction, personnel and equipment flow lines, and safety zone delineation.
2. Equipment manufacturing and testing
All equipment undergoes trial operation in our Chinese factory to ensure stable operation upon delivery.
3. Transportation and on-site installation (Dubai)
Engineers arrive on-site to guide hoisting, complete piping, electrical control integration, and overall line commissioning.
4. Production training
JCT provide clients with: operation training, maintenance training, safety training, formula suggestions, and quality control procedures.

If you are interested in JCT's two-component silicone sealant production line turnkey project, feel free to contact us: +86-18138373963 (Whatsapp, Wechat) or jctben@mixmachinery.com.